



Summary: Section Includes required modified bituminous roofing system of all roof sections identified with the drawings with the following scope of work.
Important Note: All required sub-trades required to facilitate the prescribed work will be the responsibility of the contractor.
MANDATORY SITE MEETING:
All contractors interested in bidding this tender opportunity, MUST be present at the mandatory site meeting. The meeting is scheduled for Wednesday April 14th at 11:00 AM (local time). All contractors are asked to promptly meet in the parking lot of the Community Centre, located at: 193 Gordon Avenue, Smooth Rock Falls, ON.
We asked that you email the following with your intention to attend the meeting:
Shane Skinner: shane.skinner@townsrf.ca
Yves Rochon: rochon@garlandcanada.com
Roof Replacement Specification _Community Centre Partial Roof Repalcement
Section 007200 General Conditions
2021 SRF Community Centre Drawing Package_Final
Posted on: Apr 08 2021, 3.48 PM Category: Non classifié(e)